Board of Directors’ report
8
DNO
Annual Report and Accounts 2021
Operations review
Annual Statement of Reserves and
Resources
The Company’s Annual Statement of Reserves and Resources
(ASRR) has been prepared in accordance with the
Oslo Stock
Exchange listing and disclosure requirements Circular
No.
1/2013. International petroleum consultants DeGolyer
and
MacNaughton carried out an independent assessment
of the
Tawke license (containing the Tawke
and Peshkabir fields) and
the Baeshiqa license in Kurdistan. International petroleum
consultants Gaffney, Cline & Associates carried out an
independent assessment of DNO's licenses in Norway
and the
United Kingdom (UK). The Company internally
assessed
At yearend 2021, DNO’s net proven (1P) reserves stood
at
196.1 million barrels of oil equivalent (MMboe),
compared to
216.9 MMboe at yearend 2020, after adjusting
for production
during the year and upward technical revisions. On
a 2P
reserves basis, DNO’s net reserves stood at 321.4 MMboe,
compared to 359.9 MMboe at yearend 2020.
On a proven,
probable and possible (3P) reserves basis, DNO’s net reserves
were 420.6 MMboe, compared to 549.6 MMboe at yearend
2020. DNO’s net 2C resources were 189.5 MMboe, compared
to 151.3 MMboe at yearend 2020.
DNO’s net production in 2021 totaled 34.5 MMboe (of
which
29.8 million barrels of oil (MMbbls) in Kurdistan,
4.5 MMboe in
Norway and the balance in the UK), compared to
36.6 MMboe
in 2020 (of which 30.3 MMbbls in Kurdistan, 6.0
MMboe in
Norway and the balance in the UK).
The Company’s net yearend 2021 Reserve Life Index (R/P)
stood at 5.7 years on a 1P reserves basis, 9.3
years on a 2P
reserves basis and 12.2 years on a 3P reserves
basis.
The ASRR report for 2021 is available on the
Company’s
website.
Kurdistan
Tawke license
Gross production from the Tawke license, containing the Tawke
and Peshkabir fields, averaged 108,713 bopd during 2021
(110,282 bopd in 2020). The Tawke field contributed 46,933
bopd (57,570 bopd in 2020) and Peshkabir field
contributed
61,780 bopd (52,712 bopd in 2020).
Drilling at the Tawke field resumed in the third quarter of 2021
after an 18-month pause. With few new wells, production
decline has been partially offset by gas injection and
workovers.
At yearend, four new Tawke field development wells had been
spudded, in addition to four Peshkabir wells spudded
during the
year.
DNO’s USD 110 million Peshkabir-Tawke gas project, which
was commissioned in mid-2020, captured and injected
7.6
billion cubic feet (461,500 tonnes of CO2) of Peshkabir
gas that
would otherwise have been flared into the Tawke field in 2021.
DNO holds a 75 percent operated interest in the Tawke and
Peshkabir fields with partner Genel Energy International
Limited
(25 percent).
Baeshiqa license
In August 2021, the Kurdistan Regional Government
approved
DNO’s acquisition of ExxonMobil Kurdistan Region of Iraq
Limited’s (ExxonMobil) remaining 32 percent interest in the
Baeshiqa license, doubling DNO’s operated stake. In parallel,
commerciality was declared on the license and
development
plans submitted. Shortly before yearend, the first phase
field
development plan for the license was approved by
the
Kurdistan Regional Government, clearing the way
for a fast-
track project to deliver early production from previously
drilled
but suspended discovery wells. The Baeshiqa development
is
DNO’s first new field development in Kurdistan since the startup
of the Peshkabir field in 2017.
At yearend, DNO held a 64 percent operated interest
in the
Baeshiqa license (80 percent paying interest) with partners
being Turkish Energy Company Limited (TEC) with a 16
percent interest (20 percent paying interest) and
the KRG with a
20 percent carried interest.
RESERVES
On a net basis at yearend 2021, 1P reserves
in the Company’s
Kurdistan portfolio totaled 162.2 MMbbls (175.8 MMbbls
at
yearend 2020), 2P reserves totaled 267.4 MMbbls
(295.4
MMbbls at yearend 2020) and 3P reserves totaled
348.5
MMbbls (453.7 MMbbls at yearend 2020). Net
2C resources
were 71.3 MMbbls, compared to 26.9 MMbbls at
yearend 2020.
At the Tawke license containing the Tawke and Peshkabir
fields, at yearend 2021 gross 1P reserves stood at
216.2
MMbbls (162.2 MMbbls on a net basis), compared
to 234.4
MMbbls (175.8 MMbbls on a net basis) at
yearend 2020. At
yearend 2021 gross 2P reserves stood at 356.6
MMbbls (267.4
MMbbls on a net basis), compared to 393.9 MMbbls
(295.4
MMbbls on a net basis) at yearend 2020. At
yearend 2021,
gross 3P reserves stood at 464.7 MMbbls (348.5
MMbbls on a
net basis), compared to 604.9 MMbbls (453.7 MMbbls
on a net
basis) at yearend 2020. At yearend 2021, gross 2C
resources
stood at 47.6 MMbbls (35.7 MMbbls on a net
basis), compared
to 17.7 MMbbls (13.3 MMbbls on a net basis)
at yearend 2020.
The Baeshiqa license contains two large structures with
multiple independent stacked target reservoirs, including
in the
Cretaceous, Jurassic and Triassic formations. The structures at
Baeshiqa and Zartik have the potential to be part
of a single
accumulation of hydrocarbons at one or more of
the geological
formation intervals. At the Baeshiqa structure and
following a
discovery in 2019, testing and appraisal of the Baeshiqa-2
exploration well was concluded in 2020. The well tested
hydrocarbons to surface from multiple Jurassic and Triassic
zones. The Company performed additional appraisal
studies in
At yearend 2021, gross 2C resources at the Baeshiqa
structure
stood at 48.4 MMbbls (31.0 MMbbls on a net
basis), compared
to 37.8 MMbbls (12.1 MMbbls on a net basis)
at yearend 2020.
At the Zartik structure, the Company completed drilling
and
testing of Zartik-1 exploration well in 2020. The
well tested
hydrocarbons to surface from several Jurassic zones.
The
Company performed additional appraisal studies in
2021.
At yearend 2021, gross 2C resources at the Zartik
structure
stood at 7.4 MMbbls (4.7 MMbbls on a net
basis), compared to
4.7 MMbbls (1.5 MMbbls on a net basis) at
yearend 2020.